December 30, 2005
What I Did Over My Christmas Vacation
It took about five days to remodel our bedroom. That's counting the days that we were really lazy and got a slow start, and the time it took to move all of our furniture in and out of the room. And the time it took to tape around all of the doors, and windows. And that short sentence doesn't convey how freakin' long it took to tape around everything. The walls have been painted with American Tradition satin in Autumn Sky, and the floors are Kronotex wood laminate in Heirloom Cherry. The baseboards were replaced and painted in a white semi-gloss.
I did the majority of the taping and cutting in (except for the ceiling). Rob assisted with taping and pried off the old baseboards. My mother came over and ripped out the carpet and padding, pulled up tack strips and nails from the concrete foundation, and helped with painting and cutting in at the ceiling, which I had been dreading. She also assisted with shopping for baseboards, and loaned us tons of supplies for painting and prying glue up from cement (who knew they made a tool for that?) which we didn't have. Then she came over the next day and helped lay the underlayment padding over the concrete floor. Then her friend Tami came to install the floor. My mother, Tami, and Tami's friend Frank laid the laminate flooring for the entire room while Rob and I said "Hey, that's cool!" and tried to stay out of their way. They also installed the new baseboards which Rob and I had painted. Then Rob caulked the baseboards once they were installed. All we have left to do is install thresholds in both doorways, and buy curtains.
Thanks to my mother, and Tami and Frank.
(More photos can be found here.)
Subscribe to:
Post Comments (Atom)
2 comments:
Fo shizzle!!
Looks really nice. Kick ass. Aren't you glad to have had a productive holiday?
Oh yeah, but I wouldn't exactly have been complaining if I'd spent it sipping pina coladas in Cozumel either.
Post a Comment